Skip to content
Y&Y Contractors

Bathrooms

Full Bathroom Renovation

A dated, dark bathroom stripped back to the walls and rebuilt as a clean, bright, fully-tiled space, done in a week.

Location
North London
Completed
November 2023
Duration
1 week
Full Bathroom Renovation
Full bathroom fit-outPlumbingTilingPlastering & decorating

01 / The challenge

The bathroom was tired and dated, dark wood, worn fittings and old tiling, and no longer worked for a busy household.

02 / What we did

  1. 1Stripped out the old suite, tiling and fittings back to the walls
  2. 2First-fixed the plumbing and set the new bath, basin and toilet
  3. 3Fully tiled the walls and floor and fitted a glass shower screen
  4. 4Replaced the window with frosted glass and finished with new fixtures throughout

03 / The result

A fresh, fully-tiled bathroom that feels twice as bright, turned around in a single week with minimal disruption to the household.

Before & after

Bathroom before and after before
before
Bathroom before and after after
after

Gallery

Full Bathroom Renovation 1
Full Bathroom Renovation 2
Full Bathroom Renovation 3
Full Bathroom Renovation 4

Start your project

Get a free, no-obligation quote

Answer a few quick questions and add photos, the Y&Y team will get back to you with a quote, usually within 1–3 working days. Prefer to talk now? We're a call or message away.

We'll get back to you as soon as we can
Step 1 of 4Services

What do you need doing?

Pick everything that applies.

Takes about 2 minutes

Prefer someone to come and look? Book a free home visit instead.

CallWhatsAppBook