Bathrooms
Full Bathroom Renovation
A dated, dark bathroom stripped back to the walls and rebuilt as a clean, bright, fully-tiled space, done in a week.
- Location
- North London
- Completed
- November 2023
- Duration
- 1 week

Full bathroom fit-outPlumbingTilingPlastering & decorating
01 / The challenge
The bathroom was tired and dated, dark wood, worn fittings and old tiling, and no longer worked for a busy household.
02 / What we did
- 1Stripped out the old suite, tiling and fittings back to the walls
- 2First-fixed the plumbing and set the new bath, basin and toilet
- 3Fully tiled the walls and floor and fitted a glass shower screen
- 4Replaced the window with frosted glass and finished with new fixtures throughout
03 / The result
A fresh, fully-tiled bathroom that feels twice as bright, turned around in a single week with minimal disruption to the household.
Before & after


Gallery




Start your project
Get a free, no-obligation quote
Answer a few quick questions and add photos, the Y&Y team will get back to you with a quote, usually within 1–3 working days. Prefer to talk now? We're a call or message away.
Book a free visitPick a time that suits youWhatsApp usFastest way to reach us07349 968805Mon–Sun, 8am–6pm
We'll get back to you as soon as we can
Step 1 of 4Services
What do you need doing?
Pick everything that applies.
Takes about 2 minutes
Prefer someone to come and look? Book a free home visit instead.


